Power: About 700KW, power consumption per ton wheat: 65KW.H.
Adopts 8 sets of 100mm style double mills, 4 sets of 1250mm style double mills
The size of workshop: The customer has one 5 floor building. The length of the workshop is 40m, the span is 10m, and each floor is 4m.
The number of the workers It needs 3 shifts per day; every shift needs 6-8 workers.
The customer Ismil is a flour distributor in Algiers more than 20 years, he is very familiar with the wheat flour market, and after visiting more than 5 flour mill factories in China, he chose to cooperate with us.
After two month on production, one and half month by shipping, 3 month for installation, the flour factory begin to work in March of 2011, and now customer Ismil have larger market than before, the flour is not enough for selling, he is considering to buy another 500 ton/d line from us next year.
Get in touch now
We receive enquiries in English, Español (Spanish), Русский язык (Russian), Français (French) and العربية (Arabic). Our professional team will reply to you within one business day. Please feel free to contact us!